Property inspection & snagging company · Dubai
Inspected to the standards British homes are built to.
We inspect before you accept the keys, measure every defect against a published tolerance, and stay with it until the developer has put it right.

Transparency
Why others look cheaper on the surface.
Not by doing the same work for less. By taking most of it out of the headline fee and charging for it afterwards, once you are committed and the developer is already arguing. We are not the cheap option, and this is what the cheap option leaves out.
Pricing
Published. In full.
Nobody else at this end of the market publishes prices. We do.
Essential
The inspection and the report.
AED 2,700
up to 969 sqft, then AED 2.97 / sqft
- ✓Full snagging inspection
- ✓412-checkpoint platform survey
- ✓Written report within 24 hours
- ✓One re-inspection
Most chosen
Complete
Inspection, unlimited re-inspection, developer chasing.
AED 4,900
up to 969 sqft, then AED 5.02 / sqft
- ✓Everything in Essential
- ✓Unlimited re-inspections
- ✓Developer liaison until resolved
- ✓Thermal and moisture survey
- ✓11-month warranty check diarised
Remote Concierge
End to end, for owners who are not in the room.
AED 13,000
up to 969 sqft, then AED 5.02 / sqft
- ✓Everything in Complete
- ✓Key collection under POA
- ✓Live video walkthrough
- ✓Utility connection and DEWA setup
- ✓Snag-free handover certificate
Priced on built-up area per title deed. No asterisks, no hidden extras.
Sample report
Download a real report before you spend a dirham.
Every entry is located, photographed, measured, and cited against the standard it fails. Two hundred of them, typically, in a new two-bedroom apartment.
Download the sample report →Illustrative sample — not a real inspection finding
D-041 · Master bedroom · Window 2
Window frame out of plumb; seal compromised at head
Measured
5.2mm deviation over 2m
Tolerance
±3mm over 2m
Citation
NHBC Standards Ch. 9.2
Action — Re-set frame, replace head seal, re-test.
How it works
Four steps, and we do three of them.
Community, unit type, developer. We quote a fixed fee the same working day.
Four to six hours on site, 412 checkpoints, thermal and moisture where required.
Within 24 hours, defect by defect, with the tolerance each one fails.
Re-inspection, developer liaison, and an 11-month warranty check diarised.

Remote owners
Handover, handled, while you are four thousand miles away.
You do not need to fly in. We collect the keys, walk you through the property live, and hold the developer to the snag list on your behalf.
See the remote service →- 01Live video walkthrough on inspection day
- 02Key collection under power of attorney
- 03Developer liaison until every item is closed
- 0411-month warranty check included
Our platform
The software is ours. That is why nothing is skipped.
Our inspectors work through a 412-point survey built in-house. Each item is photographed, measured and time-stamped on site. The report is generated from that record, not written up afterwards from memory.
- ✓Every checkpoint signed off individually
- ✓Measurements entered against the tolerance
- ✓Defect status tracked to closure
What owners say
TODO: real Google reviews go here — none published yet.
Questions we are asked
Essential starts at AED 2,700 for a property up to 90 m², Complete at AED 4,900, Remote Concierge at AED 13,000. Larger properties are charged per square metre at the rate shown in the table. The quotation is fixed before we attend.
Four to six hours on site for an apartment, a full day for most villas. The written report follows within 24 hours.
412 checkpoints covering structure, joinery, glazing, tiling, MEP, drainage falls, HVAC balancing, and every wet area. Thermal and moisture surveys are included from Complete upwards.
NHBC Standards and the relevant British Standards, including BS 5606 for tolerances and BS 5385 for tiling. Each defect entry cites the clause it fails, so there is nothing to argue about.
Your DLP typically runs for twelve months from handover. We diarise an 11-month warranty check under Complete and Remote Concierge, so anything that has emerged is raised while the developer is still liable.
Yes. Remote Concierge covers key collection under power of attorney, a live walkthrough at a time that suits you, utility setup, and developer liaison through to sign-off.
We restate the measurement and the clause in writing and escalate. Most disputes end there. Where they do not, the report is written to stand up in a formal complaint.
Before the keys change hands.
Send us the handover date and we will come back the same working day with a fixed fee and the earliest inspection slot.